App structure, incl. context

Table of contents

Register Page

Implemented Version

Register Page

Login Page

Implemented Version

Login Page

User Dashboard

Implemented Version

User Dashboard

Product Backlog

Product Backlog Conception Phase

product backlog

Product Backlog Implemented Version

Product Backlog 2.0

What has changed

  • As you can see we have completely changed our Product Backlog design compared to what we thought it would look like in the conception phase
  • Instead of a table with each task being a row, it now is in the same design as the Sprint View
  • We have four columns each representing a different phase
  • During these phases the first idea of a feature or task is refined and made ready to be in a sprint

Sprint View

Sprint View Version Conception Phase

sprint backlog

Sprint View Version Implemented Version

Sprint View 2.0

What has changed

  • On this route not that much changed
  • We still have 4 columns
  • The first column is now named differently
  • The selection of sprints now is done with a navigation bar similar to a radio button instead of a drop down menu
  • The columns are not framed anymore but are kind of free floating

Create Ticket

Create Ticket Version Conception Phase

submit ticket

Create Ticket Version Implemented Version

Create Ticket

What has changed

  • This design in its core stayed the same
  • However there a lot more fields than in the conception
  • Additionally instead of a Pop-Up with a frame around it, it now is a seperate page
  • We also added little descriptions under each field

Edit Ticket

Edit Ticket Version Conception Phase

Edit ticket

Edit Ticket Version Implemented Version

Edit Ticket

What has changed

  • In its core this design stayed the same as well
  • Here we also made it a seperate page instead of a Pop-Up
  • The Delete, Cancel and Submit button now are all on the lower left corner